PROJECTS

STAIRS AND RAILINGS

LaGuardia Airport Pedestrian Bridge B

LaGuardia Airport Pedestrian Bridge B

Cody Builders Supply fabricated roof railings and miscellaneous metals for the new LaGuardia Airport Pedestrian Bridge B in 2020 (Southwest terminal). The Brooklyn Diner stainless steel cladding was a unique piece of work within Pedestrian Bridge B. The cladding has a custom non directional finish

Read More »

Oakland Zoo construction

The bison viewing area of the new California Trail exhibit at the Oakland Zoo. Slated to open in 2018. Cody Builders fabricated the circular canopy with the eagle flying above it.

Read More »

South Sacramento Corridor Phase II

Year Completed: 2015 | Owner: Sacramento Regional Transit District | General Contractor: Balfour Beatty Infrastructure, Inc. | Sub Contract Value: $1,070,000 Subcontract Scope / Description of Work: Steel framing, handrails and complex architecturally exposed station canopies with integrated services.  

Read More »
Powder-coated aluminum handrails for Bay Park E1 and E2

Bay Park E1 and E2

In 2015 Cody Fabricated structural steel, stairs, and powder-coated aluminum handrails for these electrical substations for the Bay Park Treatment Plant in Nassau County.  The architect (Hazen and Sawyer) won an award for the ship-like design of the structures.  The erection was done by Guytec

Read More »

Wards Island Bronx and Manhattan Grit Chambers

New York, NY Size: $75,000,000 Year Completed: 2013 Owner: NYC Dept of Environmental Protection General Contractor: John P. Picone Sub Contract Value: $2,406,000 Subcontract Scope / Description of Work: Railing to match existing, structural retrofit members, as well as new rails, ladders, check plate, bollards,

Read More »

NYC DEP Manhattan Pump Station

  Completion: 2013 Location: Manhattan, NY Type: Waste-water pumping station Cody excels at going above and beyond the ordinary demands of a fabricator of custom metals.  Creating this custom elliptical grillwork for the NYC DEP Manhattan Pump station, Cody shop assembled the elements of structural

Read More »

Vineyard Surface Water Treatment Plant

Sacramento County, CA Size: $207,000,000 Year Completed: 2011 Owner: Sacramento County General Contractor: Balfour Beatty Infrastructure Sub Contract Value: $5,047,000 Subcontract Scope / Description of Work: 900 tons of structural steel as well as all miscellaneous metals and railings. Click here for water-technology.net project details

Read More »

Browse by category

STRUCTURAL STEEL

ALUMINUM

STAINLESS STEEL

STAIRS AND RAILINGS

MISCELLANEOUS METALS

ORNAMENTAL

Featured Projects